City of Rancho Palos Verdes Storm Drain Point Repair
CWE is providing design services to the City of Rancho Palos Verdes for the Storm Drain Point Repair project. The City completed a storm drain lining project in 2013, and during that project, a number of pipes were identified as requiring replacement or significant repairs before lining could be implemented. CWE is designing over 1,500 linear feet of replacement and repairs so future lining can be installed. CWE is designing these replacement and repairs for storm drains in 11 different locations. Additional tasks were added to protect downstream natural drainage courses from erosion that is causing bank failures. Tasks included: reviewing existing records and data, conducting hydrologic and hydraulic analyses for each of the sites, performing topographic surveys, performing geotechnical investigations, locating utilities, conducting biological assessments, obtaining all necessary permits, and preparing Plans, Specifications, and Estimates (PS&Es) for each of the 11 project sites.
Details
Client:
Start Date:
End Date:
Awards
This project received awards from:
- American Public Works Association (APWA)
- American Society of Civil Engineers (ASCE)
- Engineering News-Record (ENR)
- California Stormwater Quality Association (CASQA
- Storm Water Solutions magazine
Sitework
- Site Grading
- Roadway Paving
- Retaining Walls
- Recycled Water Line
- Piping Plans
- Stream Channel and Infiltration Basin Design
- Water-Tight System for Irrigation
- Electrical and Mechanical Plans
- Supervisory Control and Data Acquisition (SCADA) Plans
Public Enhancements
- Park Lighting and Signage
- Trails
- Viewing Areas
- Landscaping Details
Structural Improvements
- Inlet and Outlet Structures
- Bridge Structures
- Culverts
- 20-cfs Flood Control Pump Station
- Several Irrigation Pump Stations
- Other Control Structures