
City of Rancho Palos Verdes Altamira Canyon
CWE provided hydraulic analysis and debris basin design for the City of Rancho Palos Verdes Altamira Canyon Study. The Altamira Canyon watershed is comprised of approximately 860 acres located on the southern side of the Palos Verdes Peninsula that drain into Abalone Cove. CWE developed alternative designs to minimize groundwater penetration, manage stormwater runoff, and aid in controlling erosion within Altamira Canyon as part of a Project Study Report. Tasks included: project coordination; site visit, field investigation, and data review; existing and proposed conditions hydraulics studies and scour analysis; preparation and revision of a hydraulics study report; and debris basin concept development
.
Details
Client:
Start Date:
End Date:
Awards
This project received awards from:
- American Public Works Association (APWA)
- American Society of Civil Engineers (ASCE)
- Engineering News-Record (ENR)
- California Stormwater Quality Association (CASQA
- Storm Water Solutions magazine
Sitework
- Site Grading
- Roadway Paving
- Retaining Walls
- Recycled Water Line
- Piping Plans
- Stream Channel and Infiltration Basin Design
- Water-Tight System for Irrigation
- Electrical and Mechanical Plans
- Supervisory Control and Data Acquisition (SCADA) Plans
Public Enhancements
- Park Lighting and Signage
- Trails
- Viewing Areas
- Landscaping Details
Structural Improvements
- Inlet and Outlet Structures
- Bridge Structures
- Culverts
- 20-cfs Flood Control Pump Station
- Several Irrigation Pump Stations
- Other Control Structures